Cerrione, Biella
Ground-mounted Photovoltaic Plant
The Cerrione photovoltaic plant is located on industrial land owned by the Cerrione Airport. The solar park consists of 12,000 photovoltaic panels with a total peak capacity of 6.5 MWp and is capable of meeting the energy needs of 4,000 households. The panels have been installed on trackers—structures that follow the sun’s position to optimize energy production.
cliente
Baywa.Re
LOCAZIONE
Cerrione, Biella
anno
2023
POTENZA DI PICCO
6.6 MWp
Tecnologia
Tracker monoassiale
terreno
Industriale
Case history
Una selezione dei nostri impianti realizzati o in fase di costruzione.